Blog Large

/Blog Large

Under Construction: 2.8MW/DC Plant for Seminole Electric Cooperative 

Radiance has been chosen by Tampa based Seminole Electric Power Cooperative to design and build its first community solar facility. The 2.8MWDC project, also located in central Florida, will incorporate NEXTracker's state-of-the-art single axis tracking technology. [...]

By | September 15th, 2016|Categories: news, Radiance News|0 Comments

Radiance Solar Installs Solar Array at Showroom of Long­time Atlanta Retailer, Cooper Piano

ATLANTA, June 2, 2016 ­­Radiance Solar recently completed the installation of a 43kW roof mounted solar array at the Atlanta showroom of Cooper Piano. The system will produce more than 60,000 kWh annually, enough to [...]

By | June 2nd, 2016|Categories: news, Radiance News|0 Comments