Cedar Creek Water Reclamation Facility
615 MWdc | Athens-Clarke County, GA
-
Radiance Solar was contracted by Athens-Clarke County to design, engineer and build the system that will produce 1 million kWh of energy annually.
-
345W Canadian Solar Panels
-
ATI Single Axis Dura Track V3 Racking
-
Sungrow Inverters
-
Locus LGate 360 Monitoring
-
Part of Georgia Power Company’s Commercial and Industrial REDI Program